Now Haiwang cyclone has professional mineral classification, coal separation consultation team and normalized sale consultation process, being capable of providing the customer with consultation service for the whole beneficiation classification, coal separation unit and every stage in the life cycle of EPC project, so as to help the customers for the development orientation of next step soonest.

Coal Preparation Plant Technically Improvement and Construction
Coal preparation plant technically improvement and construction includes: coarse coal slime separation system improvement, coal preparation plant expand production improvement, heavy medium cyclone optimization design improvement, coal preparation density control system design and improvement and etc. By investigating at site, combining with customers’ requirements, to make professional technology improvement solution for customers’ reference.
Consult

Coarse Coal Slime FBS Separation System Improvement


Process Briefs

1.Classified and concentrated by large diameter classification concentration cyclone, coal slime was ready for entering coarse coal slime FBS separation machine.

2.Passed by the overflow of FBS separation machine, clean coal flow automatically into downstream vibrating sieve bend, coal slime centrifugal machine for dewatering and desliming. Final coarse clean coal product was produced.

3.Tailing coal(mixed coal) would be discharged from the underflow of FBS separation machine, and flow automatically into downstream coal slime high frequency screen for dewatering. And finally tailing coal(mixed coal) product was produced.


Coarse Coal Slime Spiral Separator Separation System Improvement


Process Briefs

1.Classified and concentrated by large diameter classification concentration cyclone, coal slime was ready for entering coarse coal slime spiral separator.

2.Passed by the outer side of spiral separator, clean coal flow automatically into downstream vibrating sieve bend, coal slime centrifugal machine for dewatering and desliming. Final coarse clean coal product was produced.

3.Tailing coal would be discharged from the inner side of spiral separator, and flow automatically into downstream coal slime high frequency screen for dewatering. And finally tailing coal(mixed coal) product was produced.


Coal Slime Heavy Medium Separation System Improvement


Process Briefs

1.Classified and concentrated by large diameter classification concentration cyclone, coal slime was discharged from the underflow of classifying cyclone and entered into sieve bend for further dewatering and flow automatically into mixing tank.

2.Passed by mixing pump, coarse coal slime and medium were pumped under a certain pressure into new type three-product coal slime heavy medium cyclone for separation. To get coarse clean coal, middling and gangue three products.

3.After predissociation of medium in sieve bend, clean coal and mixed coal flowed automatically into magnetic separator respectively after diluted by recycled water. Qualified medium returned into mixing tank, tailings of magnetic separator is the product.

4.Clean coal magnetic separation tailings entered into sieve bend, high frequency screen, coal slime centrifugal machine for dewatering and became final clean coal product. Mixed coal magnetic separation tailings entered into vibrating sieve bend, high frequency screen for dewatering and became middling coal product.


Relevant Cases
Provide customers with the solution of hydrocyclone intelligent expert system.
IMG
VIDEO
Technology First, Technology Innovation
Haiwang has always been adhering to the concept of scientific and technological innovation leading enterprise development